2021国内精品久久_在线高清免费不卡dvd_日本中文无线码在线观看_国产成人无码a区在线观看视频免费

DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系